Finishing up

Moving right along, the bathroom is walled in and the door installed.

Joan checks out the Bathroom

Kitchen walls going up
Stair steps going in

Front ceiling going up

Bought some bamboo poles for porch rails and other projects

Valley view from the entrance on the way out

House view from same location

Spraying lacquer on the outside walls

Upstairs walls finished

Forward view

Front room from above

View from base of stairway
Finished east wall

View from the front
Finished west side, started hand rails
Ran out of time on Saturday, the plan was to finish it, but two of the workers bailed, so Monday it is. All that is left is the finish coat on the floor and a few more windows and the screens. We are truly in awe of the quality and quantity of work these guys have done. We are working on a plan to get the electricity installed this week. I will try to get the receptacles and switches installed today, along with the rest of the handrails for the porch.
We have to wait on the security grates for the windows before furnishing it, but that should happen next week. They are going to be removable grills to cover the windows when we are away.